What to Look Out for When Negotiating with ERP Providers like Oracle & SAP

Do you know how to protect yourself and stay in the driver’s seat during contract negotiations so that you won’t be held ransom by your ERP provider?

In this article, we’re going to outline the top things you need to take into consideration when negotiating contracts with Oracle, SAP, and any other ERP system.

We’re going to share with you the key terms to clarify in your contracts to avoid extra costs and substantial frustrations down the road.

What to Look for in an ERP

While no company has a crystal ball to know exactly what the future will look like, you do need to identify how you’d like your business to function over the next 10 years.

Why 10 years?

Typical business roadmaps project as far as 3-5 years in the future. Most ERP systems relationships last a minimum of 10 years. You need to know how your business will function in order to know what you’d even need an ERP for and what it would need to do.

You need to be risk-averse in your contract negotiation in order to cover your bases for what could happen.

Once you have your future vision in place, you’ll look at the supplier landscape. Compare what each of the top ERP systems providers offers and how it’ll meet your needs outlined above. Create a Supplier Decision Matrix and stack each contender against it to determine which is the best for your corporation.

Once you know which ERP software is right for your corporation, you’ll need to dig deep to really figure out the total ownership cost. This is the tricky part and is best handled through careful contract negotiation, financial analysis, and service management.

Key Things to Consider When Negotiating an ERP Software Contract

The contract is the most important factor when determining the total cost of ownership of the ERP and there are generally only two triggers for renegotiation once a contract is in place.

These triggers are: mergers & acquisition activity and contract renewals.

Providers know that you don’t read ERP contracts every day. They design contracts in complex and ambiguous ways, which leads to more revenue for them - and more fees for you.

Each of the following points needs to be specifically addressed and outlined in your contract to prevent your ERP from holding you ransom at various times over the course of your relationship.​

Pay Attention to Intellectual Property Ownership

Many ERP contracts will state that any systems or processes developed while using the ERP are now Intellectual Property (IP) owned by the ERP provider.

We worked with a customer recently in the manufacturing industry. They had developed a process for creating their materials more efficiently going through the production line. According to their contract with their ERP provider, it shows that any process that you develop using the ERP software can be considered ERP owned IP. As such, we needed to carefully negotiate the situation with the ERP provider so as to not cannibalize the newly found process improvement which led to millions in positive P&L impact (new revenue and cost savings).

In a contract, you need to be very clear who owns the rights of process improvements as far as when it may directly or indirectly utilize an ERP system.

Your ERP is the backbone of your business. As such, if properly set-up and integrated throughout your organization, it touches most if not all aspects of your business. Naturally, this complicates any opportunity to disentangle from that ERP.

If Oracle, SAP or any other provider wanted to play hardball, they could say any process improvement that utilizes an ERP system could be co-owned or sole-owned by that ERP.  If this is the case, the provider could take that process and then go sell it.

In fact, one of our recent clients had this happen to them based on not properly reading the contract years ago. They needed to retain our expertise and a major law firm to seek litigation with that specific provider.

Make it very clear who owns what when negotiating your own contract. It needs to be clear that the client owns all IP that are developed for the benefit of their company.

Be Smart About Your License Cost Model

Everyone knows ERPs cost a lot. New contracts with smaller providers will often undercut themselves for the first year or two but will see a massive uptick in years 3-8 because the ERP knows it’s incredibly difficult to leave an ERP once you’re integrated into it.

The cost models of ERPs vary depending on the makeup of the customer’s business and what will be the most profitable for the provider.

Some of the pricing models include:

  • Seat-based: Typically the number of humans who log in to the system. These licenses can be either Perpetual or SaaS based.
  • Site-based: Number of physical locations, etc.
  • Consumption Based: Number of processes, inputs, etc., into the tool.
  • Value Based: The newest model within the marketplace and yet the scariest of all. A cost associated with the perceived value of using the platform within your business.

Generally speaking, seat-based pricing is the most cost-effective for companies looking at ERPs, but this depends greatly on what your 5-10 year plan looks like to know which would be the most beneficial to you.

In addition to your unit cost, there could also be annual maintenance expenses. This acts like an annual expense and is generally a percentage of your perpetual license fee/net spend with the ERP.

There are 2 ways to host an ERP system:

  • On-premise: Software that is loaded on the servers you’re in control of.
  • Software as a Service (SaaS): Software is hosted in the cloud by the provider.

Either way, you need to be careful how you license a product because if you don’t have control of consumption and volume-based metrics, it can skyrocket your costs.

Know Your Audit Rights

This is one that gets people in trouble a lot. Generally speaking, Oracle and SAP will not proactively limit access or connectivity to your ERP. This almost always is the responsibility of their customer, based on their unique needs.

As such, these providers will contractually allow themselves unfettered access to your ERP environment with the intent of auditing the usage of their software.

The most common areas of audit risk are:

  • License compliance (Using more seats/volume/etc than you are paying for)
  • Architecture compliance (Too many API connections, etc.)
  • M&A compliance (Acquisitions, divestiture, subsidiary utilization)

Depending on your unique situation, you may be subject to all three (or more) risk areas. It’s important to know there is intentional ambiguity by the software providers in how one could interpret contract language related to permissible use.

Furthermore, we find that clients have no intention of noncompliance within any area but find it most difficult to monitor and govern the area of architecture compliance. A common example of routine noncompliance when a client links their ERP system to both development and production environments.

Similarly, if an ERP is connected (in anyway) to a client’s CRM system it may also trigger a non-compliance event for both architecture and license compliance due to the fact that a client almost always has more active users within a CRM environment. Those CRM users may be somehow benefiting from the ERP and well, we’ll leave it to your imagination based on what you’ve already learned from this article.

Over the last 10 years, large ERP providers like  Oracle and SAP have been focused on audit rights within a client's environment. Specifically, when an ERP is living within a client’s infrastructure (on-premise) it’s technically infeasible for the provider to proactively monitor license compliance.

As such, these providers are inserting audit right language within to client’s contracts (both new and old) providing the legal authority to conduct random audits of a client’s environment. The providers deploy both human and technical based tools. The technical tools include running scripts that “listen” to your environment.

These scripts are developed by the provider themselves and are programmed in a way to identify every single endpoint. The output of the script’s analysis is a single report that identifies ways in which the client is potentially non-compliant. This automatically places the client in a defensive position leading them to try and disprove any sort of non-compliance allegations.

These guys make huge revenue by running these audits and identifying non-compliance. Architecture based non-compliance is most often the most profitable audit for a provider. In addition to what we’ve already stated, another risk area is when your ERP is connected to other systems outside of your current infrastructure.

In a nutshell, every time you make a connection between your ERP and another outside platform (often done through APIs), the ERP provider may identify this as a missed charge and will charge you retroactively since the connection was initiated. This can easily develop into millions of dollars of new revenue for the ERP providers (with very healthy sales commissions).

Not only with the ERP provider monetize the API connection with an API charge but will also try and push  value-based pricing.

For example, a client is connecting different systems together (using APIs) - this is the backbone of how their systems work. It is going to help them go to market faster.

The ERP provider is arguing the fact that “you are going to get an extra 20% increase in value from the system now vs what we quoted you. As a result, we are going to increase your fee by 20%.”

Value-based pricing is risky because these providers can charge for new API connections, new acquisitions, product launches, and/or the output of the tool and how it can help you run your business. It’s based on potential and not necessarily even realized revenue!

Don’t let a provider run a script inside your environment. If they don’t have access to your information, you’re in control of it and you remain in the driver’s seat.

Have Clear Merger & Acquisition Language

Put specific clauses in the contract that make it very clear what happens if you are acquired or if you acquire someone else.

More often, it is the provider who offers this language. These companies will put in very loose language to say ‘if this happens, we will talk about it’ which leaves a lot of area for ambiguity.

To best prepare yourself for any situation, we recommend you place specific and measures or language in your contract that outlines the cause and effect for the most common situations.

Specifically, you’ll want to identify what happens if you are acquired or if you acquire a separate entity. Within any of these situations it’s important to have clear legal language regarding the rights of your company. From a commercial perspective this means having specific pricing thresholds.

Simply put, If you are acquired, you take the better of two prices. You take the best price of both until you, as the newly combined customer, want to renegotiate.

If you are acquiring a company, it’s important to insert legal language allowing you to renegotiate the contract immediately or rather simply adding the newly acquired entity into your existing contract with only a reasonable increase in fees. From a commercial perspective it’s important that you outline what (if any) additionally fees would be subject to the transaction.

You want to eliminate ambiguity. From a pricing standpoint, you want to make this as clear as possible.

Set Expectations About Subsidiaries

You also want to know the specific parties of the agreement. A common hiccup for companies is that they don’t have subsidiary language in their ERP contracts. A company like Coca-Cola, where each product line acts as its own subsidiary, could be in default of the contract by letting that subsidiary use your system without proper language.

This is something people don’t think about until your provider comes to you and says, ‘Hey, by the way, your other subsidiaries are using this ERP software. Happy you are doing it, but that is not part of your contract so here is a bill for another million dollars.’

Third parties—suppliers, vendors, non-employees—need to be defined in the contract as well. If third parties are allowed to act on your behalf, there shouldn’t be any additional fees for them to use your system.

Be Sure to Outline Price Protection

Another thing you need to consider when negotiating your contract is price protection. Generally speaking, companies don’t write in any sort of price protection year-over-year.

What that means is that over the contract term, your ERP provider could change the price points of your unit costs at any given time.

It is not just about being clear about locking in your price at contract term, it is also putting a cap on the amount of increase that can happen at the next contract renewal, which needs to be aligned to the Consumer Price Index (CPI).

A general rule of thumb is that the increase shouldn't exceed 3-5% at renewal.

Include Clear Terms Around Your Service Level Agreement (SLA)

An ERP is a critical piece of software for any corporation and yet we often don’t negotiate Service Level Agreements (SLAs). If ERP systems go down, it can shut down governments and grids. It is a critical software within companies for good reason.

Make sure that you have the best service level agreements and governance agreements by specifically outlining them in your contract. Including these will ensure that your provider keeps their service at 99.99% performance.

In addition, there needs to be penalties for an ERP provider not meeting or exceeding their Service Levels that you agreed upon in your contract.

Most contracts will put in language about penalties but most companies don’t catch ERP providers when they are starting to fail. There are hundreds of thousands of dollars left out there because no one said “Hey your service was down over the weekend. That creates a $200k payment because it has been down for X hours.”

If a big company hires an IT governance professional to monitor that, that professional will likely be ROI positive. You pay them $130k salary and then get $250k-400k in fees coming back from the ERP provider.

Along with keeping an eye on the service levels internally, you need to put the ownership on the ERP provider to send you reports of the performance versus making you have to monitor if it was working correctly. You should put the onus on the ERP provider versus on your employees.

The big providers won’t allow this very often but the smaller ones will. Make it the obligation of the ERP provider to know that there has been a breach in the SLA.

The big ones, like SAP and Oracle, will send automated reports and humans have to look into them to see if there is an issue.

Don’t Forget Cybersecurity and Intrusion Detection

You need to be careful that if you get hacked, you don’t owe your ERP provider or are legally obligated in any other way to pay a hacking fee. This is called indemnification.

In matters of cybersecurity and hacking, your contract should stipulate that the ERP provider should be accountable, if possible. There should be financial and legal obligations, and your ERP software provider should be responsible for any sort of intrusion into the system—especially if it’s located in the cloud.

The concept being that if someone hacks your environment, the source code from the ERP could be opened to the black market for rip off and resell.

People don’t look out for this enough and hackers are getting more sophisticated every day.

Know the Rules About Implementation Partners

Implementation partners are third parties that will help develop custom code on top of the ERP system for your business.

Most of the time, your contract states that any implementation partners have to be registered as “Preferred Providers” for your specific ERP software.

You can’t have just anyone build custom code on top of an ERP system, it has to be an approved vendor.

It is a contractual risk to your company if your contractors are not certified by your ERP provider.

Your E-Commerce System Needs to Play Nice

If your company is in eCommerce, you need to make sure that there is an active and working connection between your ERP provider and your eCommerce provider.

Many ERPs will tell you “Don’t worry, we will make a connection.”

What they won’t tell you is that the connection they make will cost YOU more money. Your contract needs to dictate who is accountable for paying for any connections that are required for your eCommerce platform and your ERP system to play nicely together.

We always make the new piece of software that is connected to the ERP system pay for the API. It is the third party’s cost.

We just had a client that we saved about $500k for this very point!

They have an ERP system and they were working on getting set up with an eCommerce platform.

There was one sentence in the contract that made it ambiguous on who pays for the cost of being able to have different systems to talk to one another.

The ERP software provider was planning to charge it back to the client and the client didn’t even assume that would be their cost.

That basic API connection should not be your cost to maintain and pay for - stipulate in the contract who is responsible (ideally the third party) ahead of time so you aren’t stuck with a huge bill.

Make Sure You Have Coterminous Contracts

Another big thing to look out for is coterminous contracts. In most large companies, each department will have separate contracts with an ERP provider and these contracts won’t align on the same termination date.

If you have multiple business units in a company, the provider will often split out their budget and license fees per business unit.

This is the biggest trick in the book and the largest companies in the world forget to do this step.

It creates massive chaos because you can’t get everyone on the same page. This situation forces the client to align internally at multiple times throughout the year in the interest of representing the entire company. Clients typically lose 10 - 20% when they are in a non-coterminous environment. .

If you you are subject to an non-coterminous environment, then the ERP provider is in the driver’s seat. They will divide and conquer you. This is called a split requirement and they will negotiate with each department individually.

In other words, the ERP software provider negotiates at a business unit level versus an enterprise level. At enterprise level, you have volume and leverage to get better terms which typically drives an additional 10-20% in value.

In Conclusion

Whether you’re negotiating an initial contract or a renewal, make sure you develop and maintain a total cost of ownership view.

First, make sure you understand how your business will be growing over the next 10 years.

Then, dissect the contract so that you better understand the unit cost and connection fees.

In the contract, layout all potential possibilities early as opposed to being forced to react to them as they come along. The more prepared you are, the better you’ll be able to handle surprises, pivots, and conflicts.

Make sure that in the contract, each of the specific points outlined above are detailed with zero ambiguity. Hit all these points as a minimum.

The truth of the situation is that the sales representatives at these ERP providers know you aren’t negotiating an ERP contract everyday. While we’re not saying that every ERP sales representative leverages this face in a malicious manner, it’s important to understand how to protect your company.

As you can see, there is a lot to take into consideration when negotiating contracts with ERP providers. Keeping these points in mind will help you to protect yourself and your company. If you need help implementing any of the above, we have the experience and know-how to protect you from being held ransom now and 10 years down the line. Reach out to us, we’re here to help you with negotiating contracts with your ERP provider.

More resources

From Fortune 500 giants to fast-growing innovators, TNG has helped clients save 20% – 40%+ on enterprise software contracts — even when they thought it was impossible

3 Strategies to Elevate Your Software Supplier Relationship

Over the years, our TNG client family has requested more and more guidance related to managing and elevating their commercial supplier relationships. Within this article, you’ll find our top 3 proven strategies to transform IT supplier relationships from tactical to strategic.

Strategy #1 – Control the Flow

When we say “control the flow”, we’re referring to conversation, meeting, and engagement flow.

When prospective clients reach out to TNG, they almost always have the complaint that the supplier knows more about the “needs” of their organization than they do. This most typically is due to the internal lack of time and/or resources to focus on a specific supplier or digital capability. On the other hand, the supplier’s sales team is laser focused on opportunities to grow their business inside of your organization. Immediately, this creates an unfair environment for all parties involved.

You may be thinking that this only creates an unfair advantage for you, the customer. Well, in most situations that’s true. However, it should also be noted that in some circumstances, the supplier’s sales team may be operating with good intentions and simply answering your internal stakeholder’s demand for attention. In short, when one side knows more than the other, it creates an uncomfortable situation for at least one party.

As our team brings 100+ years of collective experience, we have seen just about everything. Most of TNG’s clients are very well-established companies that have $5 billion+ in annual revenue. These companies typically have a “center of excellence (COE)” and/or a “software asset management (SAM)” team. While the overall intent is good, we typically see only about 10% of our clients leveraging these teams of resources correctly.

What happens to the other 90%? Well, one of the most classic inside sales techniques is for a supplier’s sales team member to establish, chair, and/or participate in a COE with a specific focus on their software and its many digital capabilities. This type of group typically meets either monthly or quarterly and is sold as a way in which the sales team member can “inform” the COE/SAM team members of the “demand” coming from inside of the organization. The reality is that the “demand” is often created by the sales team member who has been pushing a land-and-expand strategy inside of the organization.

The easiest way to not only level the playing field with your software suppliers, but also elevate the relationship from tactical to strategic, is to set up strict governance around the overall engagement. Every supplier engagement is slightly unique, but we recommend focusing on the following core tenants:

  • Focus your efforts on your Top 10 software suppliers.
  • Develop a steering team of executive IT leaders that are in control of the Digital Capability strategy for your company.
  • Develop an internal COE for each of your Top 10 suppliers. The size and scope of them should proportionally match the importance of the supplier’s impact on your business.
  • Identify and assign clear roles & responsibilities for each employee team member that is part of their performance objectives.
  • Do not allow supplier sales team members to be a member of the core team but rather serve as an invited guest on a routine cadence.

This is about the time where traditional sales team members will indicate that this approach will slow down process, innovation, growth, etc. The reality is quite the opposite when properly set up and managed. The primary outcomes you want to achieve are the following:

  • Shift the communication paradigm from outside-in to inside-out. This allows the company to ideate, contemplate, and organically socialize a software roadmap (vs. constantly asking the supplier for a list of their asset inventory).
  • Share information with suppliers only when it has been fully vetted and approved as a sanctioned project or approved proof of concept. If done properly, this drastically decreases the chance of duplicate purchasing, split requirements, and/or random unwarranted proof of concepts (that usually turn into shelfware) around the enterprise.
  • Allow everyone to be more efficient and structured with their time by eliminating the need for follow-up meetings, etc. In other words, engaging suppliers only after decisions have been made internally by the COE will enable the COE to be treated as a true authoritative entity vs a “check the box” exercise.
  • Provide opportunities for suppliers to suggest innovative solutions in a fully committed environment.

We find that our TNG clients save an average of 26% annually by deploying this strategy alone (with our help, of course).

Strategy #2 – Manage Upwards

Anyone who knows the basics of selling understands that the easiest way to make a sale is to identify and influence the decision-maker directly. For large enterprise sales teams who are managing multi-million-dollar contracts, that decision-maker is very often an executive leader within the company. Far too often, we find that organizations provide unfettered access to executives without reason. This, in short, usually enables a very unhealthy and complacent comfort for the supplier sales team that (if not properly managed) rarely produces intrinsic value for the company.

By far one of the most effective ways to elevate your supplier relationship is to set up strategic business discussions between company and supplier executives. The key here is to establish equal representation on both sides and ensure there is proper attention and respect established between both companies. Access to your company’s executives should largely be restricted to these meetings which, where possible, should be set up by the COE/SAM teams mentioned in Strategy #1.

Subsequently, it’s important to know that you can leverage access to your executives to exemplify to a new supplier that any new proof of concept, tool, etc. will be given the highest level of attention and visibility. This means a lot for any supplier (new or existing) as it ensures the right eyes are engaged.

Strategy #3 – Set Realistic Milestones that are Mutually Achievable

Just as employees like to understand their performance objectives for each year, it has been proven by TNG that suppliers who understand what “great looks like” outperform those that are not given clear business objectives. Nearly everyone in the business world understands the concept of milestones; however, the implementation of the methodology is highly inconsistent.

One of the many mistakes companies make when establishing a milestone-based contract is they make the actual milestones either ambiguous or unrealistic. Both are equally as dangerous. Ambiguity allows everyone to be right and wrong at the same time. Unrealistic milestones, if accepted by the supplier, often induce unhealthy behaviors by those chartered with meeting or exceeding the same. It doesn’t take much to set a once “strategic” relationship on a path to implosion with either of these scenarios.

Establishing realistic milestones is important for your suppliers. Everyone, at every age, enjoys accomplishing a goal. It’s important to recognize this fact since at the end of the day, as this is a human reaction, and well, we’re all human.

To learn how to properly set up a milestone plan and/or implement any other strategies mentioned above that drive performance for both the company and the supplier, here’s a hint: It’s not just the supplier that has performance milestones!